What Happens Between Framing and Move-In

Key takeaways

  • Dry-in protects the building from weather
  • Rough-in inspections happen before walls close
  • Finishes and punch lists come last
  • A certificate of occupancy opens the door

A framed building still has a lot to do.

Dry-in

Roofing, windows and house wrap close the building so interior work can start in any weather.

Rough-in

Plumbing, electrical and mechanical crews install lines, then inspectors check them before drywall.

Finishes

Drywall, paint, flooring, cabinets and fixtures go in. Quality walks catch small issues early.

Closeout

Final inspections, a punch list and a certificate of occupancy let the building open.

Related services

Questions about your own project? Call or text 615-357-7797, or use the quote form below.

Request a quote

Tell us about your project.

Tell us where the land or the property is, what you would like to build or change and when. We read every message and reply with clear next steps.

  • What you would like to build, buy or fix, so the right specialist replies
  • A site address or a map pin, or a result you saved from a tool on this site
  • A plain-English plan: the steps, the order and what to expect, before we start
Prefer to talk? Call or text615-357-7797

Your development quote request

We only use your details to respond to your request.