Glossary
Development Glossary
Plat, pro forma, podium, entitlement and more: the words developers use, explained in plain English. Search or scroll.

- Absorption
- How quickly new homes are leased or sold in a market, usually counted in homes per month.
- Amenity
- A shared space or feature, such as a pool, gym, lounge or dog park, that adds to everyday life in a community.
- As-built drawings
- Drawings that show what was actually built, including changes made in the field.
- Build-to-rent
- A neighborhood of homes designed and built to be rented rather than sold.
- Certificate of occupancy
- The official document saying a building is safe and complete enough to be lived in.
- Closeout
- The final stage of a project, with last inspections, records, training and handover to the owner.
- Contingency
- Money set aside in a budget for unknowns, tracked and reported as it is used.
- Density
- How many homes sit on an acre of land, often written as units per acre.
- Detention pond
- A pond that holds storm water and releases it slowly so downstream areas are protected.
- Draw
- A request for money from a construction loan, backed by invoices, lien waivers and an inspection.
- Due diligence
- The period before a closing when the buyer checks the title, survey, soil, zoning and other facts.
- Easement
- A recorded right for someone to use part of a property, such as for a utility line or a path.
- Entitlements
- The approvals a project needs, including zoning, site plans and permits.
- Floodplain
- Low land next to a stream or river that can be covered by water in a large storm.
- Garden-style
- Low-rise apartment buildings spread across a site with surface parking and green space.
- Geotechnical report
- A study of soil and rock that guides foundation and grading choices.
- Hard costs
- The costs of physical construction, such as site work, materials and labor.
- Infill
- Building on a vacant or underused lot within an area that is already developed.
- Karst
- Limestone terrain with sinkholes, springs and caves, found in parts of Middle Tennessee.
- Lease-up
- The period when a new community fills with its first residents.
- Mid-rise
- A building of roughly four to six stories.
- Mixed-use
- A building or site that combines homes with shops, offices or restaurants.
- Overlay
- A set of extra zoning rules laid over the base zone for a corridor, a historic area or a floodplain.
- Plat
- A recorded drawing that shows how land is divided into lots, streets and easements.
- Podium
- A concrete base, often holding parking or shops, under wood-framed floors.
- Pro forma
- A projection of the costs and income of a project, used to test whether it can work.
- Punch list
- A list of small items to finish or fix before a home is handed over.
- Rezoning
- A formal request to change the zone that applies to a property.
- Setback
- The required distance between a building and a property line.
- Site plan
- A drawing that shows buildings, streets, parking, utilities and open space on a parcel.
- Soft costs
- Costs that are not physical construction, such as design, permits, legal work, insurance and financing.
- Stormwater
- Rain that runs off roofs, streets and ground and must be managed so it does not cause damage.
- Variance
- A limited exception to a zoning rule, granted when strict application would make a reasonable plan unworkable.
- Workforce housing
- Homes priced for people who work in the area, such as teachers, nurses and service workers.
No term matches that search. Try a shorter word.
Still have a question?
Describe your project and we will explain it in plain English.
