Key takeaways
- Land and studies come first
- Design and approvals overlap
- Site work and utilities set the pace for building
- Closeout and lease-up share a short window
The order of steps is the same on most projects, even when the size changes.
Land and studies
Choosing the parcel, testing the market and checking soils and title set the foundation for everything else.
Design and approvals
Site plans, drawings and permits overlap. A complete package early keeps reviews short.
Site and utilities
Clearing, grading, pipes and paving must finish before the buildings can start. Long-lead utility items are common culprits for delay.
Vertical construction
Foundations, framing, mechanical work and interiors move in a planned sequence. Rain days and deliveries matter.
Closeout and lease-up
Final inspections, a certificate of occupancy and a styled model unit let the first residents move in. The Project Timeline Builder on this site sketches a typical sequence.